PFIZER BIOLOGIC’S CLINICAL MANUFACTURING FACILITY
Devens, MA
“Your collaborative approach, experience with Building Information Modeling (BIM) technologies, project management leadership and quality execution in the field were key factors in the project’s success. Your pharmaceutical experience coupled with your team’s conceptual cost-saving capabilities supported the project’s vision out-of-the-gate.” – John Ottstadt, Senior Project Manager, Lend Lease
BRISTOL MYERS SQUIBB BIOLOGICS DEVELOPMENT BUILDING 3rd FLOOR
Devens, MA
“The attention to detail and quality execution was an example of tradesmen excelling at their job. RELCO achieved each project milestone and managed numerous design changes while continually delivering quality electrical and tel/data installations in a safe manner.” – Erick Lacy, Senior Project Manager, Consigli Construction Company, Inc.
CULTIVATE
Leicester, MA
“The new registered marijuana dispensary industry provided considerable challenges that required experience and determination to get our project completed on time. RELCO continued to find ways to keep our project on schedule, always kept the area clean and its focus on safety was appreciated.” – Samuel Barber, President, Cultivate Holdings
MODERNA THERAPEUTICS
Norwood, MA
“Your team quickly became the trade leader in design and coordination for the 200,000 square foot clinical development state-of-the-art biotech manufacturing plant. I consider RELCO as the ‘go-to’ electrical contractor in New England and leader in Biotech/Pharma constructability methods.” – William Olson, Director of Construction, Wise Construction
Lowell, MA
“The RELCO Companies stepped up to the challenging task. The leadership teams you have in place delivering your service lines are second to none; their overall performance in delivering the 230,000 square feet of mix used space (office and lab) through a very aggressive multi-phased schedule was outstanding.” – Jay Cooper, Project Manager, Jones Lang LaSalle
SHIRE PHARMACEUTICALS BUILDING 200
Lexington, MA
“The project’s delivery method challenged every aspect of your business to be more efficient and transparent from purchasing, accounting, and prefabrication to field execution and close out. RELCO met these challenges and exceeded our expectations.” – Scott Tereshak, Sr. Project Manager, Lend Lease
Durham, MA
“This was a very challenging project with the most complicated lighting package I have encountered. The task was made more difficult by an extremely aggressive schedule. RELCO performed very well and was one of the strongest members of the team. Without RELCO we would not have been successful.” – Garret Bertolini, Sr. Project Manager, PC Construction
SOUTH SHORE MEDICAL CENTER
Norwell, MA
“Your team helped us work through numerous changes to our original plans in a very professional manner without impacting our overall schedule. I am also very impressed with the quality of your workmanship – particularly, in our data closets and the electrical integration of our generator, transfer switch and building UPS.” – Mark Flieger, Chief Information Officer, South Shore Medical Center